Women’s Curve L/S Tee

The Women’s Curve L/S Tee combines lightweight comfort with a flattering curved hem design. Made from soft 100% combed cotton, it offers breathable wear and a smooth finish ideal for everyday use. Perfect for branding, retail, and promotional apparel, it delivers a clean, modern silhouette. Enquire today.

- +
SKU: AS-4055S1 Categories: , ,

Get Quote

Buy More, Save More
Bulk savings applies after selecting options in checkout cart subtotal. Prices ex gst based on lowest priced variation and exclude decoration and other costs unless stated. Bulk prices do not apply to any sales. Final pricing confirmed in quote.
25+ units 5% OFF $0.00 ea Subject to quote
100+ units 10% OFF $0.00 ea Subject to quote
500+ units 12% OFF $0.00 ea Subject to quote
1000+ units 15% OFF $0.00 ea Subject to quote
Minimum Order: 10 units per design
01
Step 1
Select Your Product
Choose your product, colour and size to get started.
02
Step 2
Customise Your Design
Upload or create a design using our online designer.
03
Step 3
Place Your Order
Submit your quote or order. We handle the rest.
Shop with Confidence
Quality Guarantee iIf you’re not happy, we’ll fix it- this promise covers our fault defects, misprints, and production errors.
Free Delivery AUS iFree delivery metro Australia & Victoria wide.
Expert Design iOur free expert design service ensures your branding looks awesome.
Easy Bulk Sample iRequest pre-production samples before bulk full print run (charges may apply).
Perks for VIPs iLoyal clients enjoy rewards like bonus swag and priority slots.
Estimated Delivery
Jul
29
Order today for delivery by:
29 July 2026
Typical Turnaround: 14 days unless otherwise stated iBased on local in-stock items from artwork approval. See our Terms and Conditions.

Start Designing

The Women’s Curve L/S Tee is designed to deliver everyday comfort with a refined, feminine silhouette. Made from lightweight 150 GSM 100% combed cotton, it offers a soft hand feel and breathable wear that suits a wide range of environments. Marle variations include a touch of viscose, adding subtle texture and visual depth. The curved hem introduces a modern finish that enhances movement and creates a flattering shape, while the regular fit keeps it easy to wear across multiple styling needs.

Built with attention to detail, this tee includes side seams for structure, shoulder-to-shoulder tape for durability, and double-needle hems for long-lasting wear. The preshrunk fabric helps maintain consistent sizing over time, making it a reliable choice for repeat use. Well suited to branding, retail, and promotional applications, it supports high-quality decoration methods including screen printing, DTG, and embroidery. Contact us today to customise your Women’s Curve L/S Tee.

10+

Product Size:
XSM

Product Colour Options:
Black, Army, White, Navy, Grey Marle

Branding Options:
Embroidery and Screen Printing

Print Area:
Embroidery: 100mm x 75mm
Screen Printing: 290mm x 400mm

Delivery Lead Time:
Usually 2-3 weeks from artwork approval. If needed earlier, call or email us – we are here for you.